Magdala Avenue, London N19
Sector: Health
Scope: 294 No. 450mm CFA piles and 63 No. 600mm diameter contiguous wall piles
Duration: 8 weeks Plant: Llamada P135
Strata: Made Ground over London Clay
Engaged by a large national main contractor GMP overcame a multitude of challenging factors including multiple piling platform levels and narrow access. GMP were not given sole possession of the site and communicated effectively with other Sub-Contractors to complete the piling works.