Plot 1, Brent Cross
Sector: Commercial
Scope: 180 No. 600mm, 30 No. 750mm diameter CFA piles and 8 No. 900mm diameter crane base piles
Duration: 7 weeks Plant: Llamada P140
Strata: Made Ground over London Clay
Being a CAT 1 contractor, GMP were approached to develop the Plot 01 scheme from an early stage. A collaborative approach by the GMP design team, main contractor and structural engineer enabled the project to value engineered, but also a 70% replacement concrete blend was utilised to improve the sustainability score. The project went very well and the GMP crew managed to reduce the programme by almost three weeks!