Cecil Avenue, Wembley

Sector: Residential
Scope: 667 No. 350mm, 49 No. 450mm, 281 No. 600mm diameter, 17 No. 750mm diameter CFA piles and 23 No. 350mm diameter contiguous wall piles. The design also required 8 No. working and 2 No. non-working test piles
Duration: 20.5 weeks
Plant: Llamada P140

Strata: Made Ground over London Clay

Early engagement is something that GMP always actively encourage, Cecil Avenue was a success story for this. Weekly design meetings between GMP, the client and the engineer enabled the project to be value engineered effectively for both cost and programme. Due to groundwater concerns a water relief bore was undertaken, a simple solution to a common issue. GMP also undertook further calculations for both the anchorage design and also to tie back the sheet piled wall into the new pile caps, to provide an economical solution.