Chobham Lane, Chertsey
Sector: Commercial
Scope: 272 No. 900mm contiguous wall piles
Duration: 9 weeks plus 2 weeks guidewall
Plant: Llamada P135 & Llamada P140
Strata: Made Ground over Windlesham & Bagshot Sand
GMP are experienced in designing and installing contiguous piled walls and this was both an interesting and a complex project. This retaining wall enabled the client to retain 9.5m of existing ground in order to construct a number of commercial units at a lower level. Two rigs were utilised and GMP’s experienced crews made sure the required programme was achieved.