Drummond Road, Bermondsey
Sector: Mixed use
Scope: 14 No. 450mm diameter, 225 No. 600mm diameter, 18 No. 750mm diameter CFA piles and 12 No. 750mm diameter and 12 No. 900mm diameter crane base piles
Duration: 9 weeks Plant: Llamada P140
Strata: Made Ground over Kempton Sand and Gravel over London Clay over Lambeth Clay
GMP were engaged to pile an interesting scheme in South East London. With the Network Rail assets in close proximity, good communication was required to ensure all guidelines and associated health and safety requirements were adhered to. The GMP design had to cater for some significant tension loads within the crane base. Anchorage design was also required.