Wood Lane End, Hemel Hempstead
Sector: Residential
Scope: 497 No. 350mm diameter CFA piles and 16 No. 350mm diameter CFA crane base piles
Duration: 5 weeks Plant: Llamada P105
Strata: Made Ground over Lambeth Clay over Seaford Chalk
GMP have a vast experience of CFA piling into chalk. With over 30 years of design knowledge, combined with a very good relationship with the main contractor, GMP were able to greatly increase productions and as a result saved nearly 2 weeks off the programme.